BTP
GHG Protocol · ISO 14064-1 · ADEME / INIES

The carbon footprint of your projects, ready for your lenders

Enter your quantities of concrete, steel, fuel and transport. Carbonix BTP applies the ADEME and INIES emission factors, then produces a PDF report by scope and by phase, ready to attach to your financing files and tenders.

  • 1 free project
  • No credit card
  • MTN and Moov Mobile Money
Carbon bill of quantities · demotCO₂e
ItemQuantitytCO₂e
Reinforced concreteScope 3 · materials
m³
212.5
Reinforcing steelScope 3 · materials
t
190.0
Machinery dieselScope 1 · combustion
L
133.1
535.6tCO₂e
Top item: concrete (40%)

Rough order of magnitude with average factors (concrete 0.25 t/m³, steel 2.0 t/t, diesel 3.17 kg/L). The app uses the exact ADEME or INIES factor for each material and covers 9 modules.

Why now

Carbon reporting already decides your financing and your contracts

In France and Europe, the law requires it. In West Africa, it is the lenders and project owners who ask for it. Either way, you need a defensible figure.

37 %of global energy-related CO₂ emissions come from buildings and construction (UNEP)
9calculation modules, scopes 1, 2 and 3
50+ADEME and IPCC emission factors
5project phases, from design to demolition

Access to financing

AFD, BOAD, the World Bank and the EIB increasingly require the carbon footprint of the infrastructure projects they finance.

Paris Agreement · WAEMU / ECOWAS NDCs

Tenders

Public procurement now includes environmental criteria. A documented assessment sets you apart at scoring time.

Environmental criteria in tender documents

Regulation

RE2020 for new buildings, mandatory GHG report above 500 employees, CSRD for large European companies.

RE2020 · Grenelle II art. 75 · CSRD · EU Taxonomy
What you measure

Nine modules that speak the language of the site

You enter quantities you already know: cubic metres, tonnes, litres, machine hours. The software handles the emission factors and the classification by scope.

ModuleExamplesScope
FuelsDiesel, petrol, natural gasScope 1
EnergySite and office electricityScope 2
MobilityStaff travelScope 3
FreightTransport of materials and wasteScope 3
MaterialsConcrete, steel, wood, bitumen, PVC (INIES factors)Scope 3
WasteSpoil, rubble, site wasteScope 3
Plant and machineryExcavators, bulldozers, cranes, compactors, hourly calculationScope 1
Motor assetsOwned vehicles and plantScope 3
Building assetsSite facilities, offices, warehousesScope 3
Your dashboard

You see at once where emissions concentrate

Every project shows its total, the share of each scope and the items that weigh most. That is where your reduction levers are: low-carbon cement, reuse, optimised machine rotations.

  • By scope: 1, 2 and 3, per the GHG Protocol.
  • By phase: design, construction, operation.
  • By item: to compare material variants.
On site

Built for the data your teams already record

Mobile crane and rebar on a construction site — Carbonix BTP carbon assessment
Plant and materials
Concrete mixer trucks delivering concrete on site — freight carbon tracking
Transport and freight
How it works

Up and running in three steps

  1. Create your project

    Location, type of works (construction, renovation, infrastructure), phases and stakeholders. Invite your team.

  2. Enter your data

    Fill the modules with your real or estimated quantities. The ADEME and IPCC factors are already built in.

  3. Export your report

    A PDF compliant with the GHG Protocol and ISO 14064-1, ready for your lenders, clients or the authorities.

Who it is for

Every player in the project finds a use for it

Engineering firms and engineers

Compare material variants from the design stage and produce compliant reports.

Construction companies

Measure plant, transport and materials to answer green tenders.

Public project owners

Steer the carbon of a portfolio of works and report to lenders.

Property developers

Anticipate RE2020 and add value to your programmes with a documented assessment.

Local and national authorities

Declare scopes 1, 2 and 3 of public infrastructure within the NDCs.

Consultants and auditors

Run assessments for several clients on a single platform.

Included in the platform

Designed for teams split between office and site

Dashboards

Emissions by scope, by category and by phase, in charts a steering committee can read.

Signed PDF reports

Complete reports, compliant with lender requirements, in PDF and Excel.

Team roles

Administrator, analyst, viewer. Invitations by email.

French, English, Portuguese

The interface and the reports are available in all three languages.

Mobile Money

Kkiapay and FedaPay for MTN and Moov, Stripe for international cards.

Custom factors

On the Pro plan, add your own emission factors, for example those of a local supplier.

Pricing

A free project to start, with no time limit

Payment by card or MTN and Moov Mobile Money

Frequently asked questions

What people ask us before getting started

Is a carbon assessment mandatory for my company?

In France, yes in several cases: RE2020 for any new building, a GHG report every 4 years above 500 employees, CSRD for large companies. In West Africa, it is mainly required by lenders and in tenders.

Are the calculations compliant with the GHG Protocol and ISO 14064-1?

The calculation follows the scope 1, 2 and 3 structure of the GHG Protocol and the principles of ISO 14064-1, with the ADEME, INIES and IPCC emission factors.

Can I use it for a project in West Africa?

Yes. The platform was designed for France and West Africa: Mobile Money payment, an interface in French, English and Portuguese, and customisable factors on the Pro plan.

What is the difference between the Free and Pro plans?

The Free plan covers one project and one user with a basic PDF export. The Pro plan opens unlimited projects, up to 2 users, custom exports and your own emission factors.

Do I need a credit card to start?

No. The free account is created with an email address. You choose a payment method only if you upgrade to Pro.

Your next tender will ask for a carbon assessment

Prepare it now on your current project. The first project is free.

Create my free account

No credit card · 1 project included

Carbonix BTP1 free project

Create account