Environmental and social monitoring and evaluation
Your PGES tracked in real time, from field measurement to funder report
Configure your measures and indicators without code. Collect field evidence, have every entry validated by the right person, and generate your PDF and Excel reports whenever they're requested.
- Free: 1 main PGES + 1 site PGES
- No credit card required
- Ready in minutes
PGES · rural roads, lot 2Example
Physical progress78 %
Financial progress54 %
Indicators tracked32
People reached by awareness sessions (GBV, STIs, road safety)
1,836
out of a target of 2,400 · 77%This quarter's measuresController → Supervisor → Manager
- Watering of tracks to control dustApproved
- Compensatory planting, 1,200 seedlingsWith the supervisor
- Grievance log (GRM) up to dateNeeds correction
- PPE worn on siteApproved
The problem
A PGES depends on evidence. It usually gets lost between two emails
Monthly company reports, inspection sheets, photos, attendance lists: when everything moves around as separate files, the quarterly report has to be rebuilt by hand and gaps surface too late.
Today
- Excel sheets emailed back and forth, in several versions
- Photo evidence stored on phones
- No one knows which data has been verified
- The funder report takes days to assemble
With Carbonix PGES
- One single base for all measures, phases and companies
- Every entry linked to its evidence and its author
- A visible validation flow, with full history
- Physical and financial progress consolidated in real time
Validation workflow
Every entry passes through three sets of eyes before reaching the report
The review chain separates roles: whoever enters the data doesn't validate it. Every return is tracked, with a comment.
Level 1ControllerRecords the measure on site, attaches photos and documents.
Level 2SupervisorChecks consistency, approves or returns it with a comment.
Level 3ManagerApproves the entry, which then feeds the indicators and reports.
Reporting studio
Gaps show up before the supervision mission does
Every indicator shows its target, its actual value and its status. A breached threshold stands out immediately, and you always know which validation level a given entry has reached.
- Alert thresholds: spot indicators falling short of target.
- Breakdown: by gender, age, company or phase.
- Export: pivot tables in Excel, charts in PNG.
PGES · rural roads, lot 2This quarter's indicators
Physical 78 %Financial 54 %
| Indicator | Target | Actual | Progress | Status |
|---|---|---|---|---|
| People reached by awareness sessions | 2 400 | 1 836 | In progress | |
| Seedlings planted | 1 200 | 1 200 | Achieved | |
| Grievances handled on time | 90 % | 84 % | Below threshold | |
| Workers equipped with PPE | 100 % | 97 % | In progress |
ControllerSupervisorManager
How it works
Up and running in four steps
Configure
Model your PGES, phases, measures and indicators without writing code.
Collect
Field data entry, forms and evidence, broken down by gender and age.
Validate
A review flow that moves between levels.
Steer
Dashboards, alerts, reports and exports in real time.
Features
All your monitoring and evaluation in one place
100% configurable
Phases, levels, measures, indicators, forms and roles are all set up without a line of code.
Disaggregated indicators
Track progress over time by gender, age and other criteria, with targets and achievement rates.
Real-time consolidation
Physical and financial progress by PGES, phase, company and project.
Validation workflow
Controller, supervisor, manager review chain, with full traceability.
Reporting studio
Pivot tables and charts, exportable as PNG and Excel.
Reports and exports
PDF for management and funders, multi-sheet Excel and CSV.
Who it's for
For those who implement, control and finance
Project management units
Track every PGES across a program and respond to supervision missions.
Companies and supervision firms
Report the measures applied on site, backed by evidence.
Funders and institutions
Consolidate several projects and organizations in a single view.
In the field
Evidence comes from the field, not a spreadsheet


Pricing
Start for free, scale as your program grows
Indicative prices in euros, excluding tax. Currency and amounts can be adapted to your market (CFA franc, USD).
Frequently asked questions
Before you create your space
What is a PGES?
The Environmental and Social Management Plan (PGES) follows on from the impact assessment (ESIA). It lists the measures to avoid, reduce or offset a project's impacts, along with who is responsible, the indicators and the timeline. Carbonix PGES is used to track how they are implemented.
Is the platform really no-code?
Yes. Phases, levels, measures, indicators, forms and roles are all configured from the interface.
Can I manage several projects and organizations?
The Pro plan covers unlimited PGES. The Team plan adds multi-organization support and consolidation, useful for a project management unit or a funder.
How does data validation work?
Every entry follows the controller, supervisor, manager review chain. A returned entry goes back to its author with a comment, and the full history stays available.
Can I export my data and reports?
Yes: PDF reports, multi-sheet Excel, CSV, and PNG charts from the reporting studio.
Is my data protected?
Each organization has its own space, with roles and permissions. The Enterprise plan adds SSO and dedicated hosting.
Your next supervision mission is coming. Be ready
Create your space, set up a first PGES and invite your team.
Create my free space
No credit card required · Free: 1 main PGES + 1 site PGES